Charleroi Metro

Light rail · TEC Charleroi

3 lines · 45 stations · 8 interchanges

Every line drawn through its stations. Tap a line in the legend to hide or show it.

Lines

Service information checked . Check the operator before travel because schedules can change at short notice.

Quick facts

Operator
TEC Charleroi
Lines
3 current lines
Payment
Use the local operator’s app, ticket machine, or accepted contactless product before boarding. Belgium’s regional operators share some ticket products, but one operator’s fare is not automatically valid on every network.
Network type
light rail

Mike’s notes

Charleroi Metro serves Charleroi with M2, M3, M4. The diagrams use current station order and official route shapes rather than straight geographic shortcuts.

Charleroi’s light-metro project began opening in 1976. It reused parts of the older vicinal tramway and added grade-separated infrastructure, leaving a compact operating network alongside several never-opened sections.

Tickets and vehicles

Use the local operator’s app, ticket machine, or accepted contactless product before boarding. Belgium’s regional operators share some ticket products, but one operator’s fare is not automatically valid on every network.

The assigned metro, tram, or light-rail vehicle can change by departure. Floor height, air conditioning, seating, and interior space are not consistent across every fleet.

Accessibility

Step-free access varies by stop and vehicle. Check the operator’s current lift, platform, and disruption information when accessible travel is essential.

Source: Charleroi Metro official service information.

Sources and references (1)
  1. Official service information