Charleroi Metro M4
CHARLEROI Ouest (M) to GILLY Soleilmont (M)
Stations
9
End to end
~8 min
Interchanges
2
Geographic station positions along the line.
Service information checked . Check the operator before travel because schedules can change at short notice.
M4 runs between CHARLEROI Ouest (M) and GILLY Soleilmont (M) as part of Charleroi Metro. This stopping pattern has 9 stations.
Read the destination display before boarding. Short turns, engineering work, and timetable changes can alter the final stop even when the public line name stays the same.
History
Charleroi’s light-metro project began opening in 1976. It reused parts of the older vicinal tramway and added grade-separated infrastructure, leaving a compact operating network alongside several never-opened sections.
Tickets and vehicles
Use the local operator’s app, ticket machine, or accepted contactless product before boarding. Belgium’s regional operators share some ticket products, but one operator’s fare is not automatically valid on every network.
The assigned metro, tram, or light-rail vehicle can change by departure. Floor height, air conditioning, seating, and interior space are not consistent across every fleet.
Accessibility
Step-free access varies by stop and vehicle. Check the operator’s current lift, platform, and disruption information when accessible travel is essential.