Ho Chi Minh City Metro

Metro · Ho Chi Minh City · HURC1 / Management Authority for Urban Railways (MAUR)

1 line · 14 stations

Every line drawn through its stations. Tap a line in the legend to hide or show it.

Lines

Quick facts

Operator
Ho Chi Minh City Urban Railway Company No. 1 runs the first line, with MAUR as the city rail authority.
Payment
Tap in and tap out at the fare gates with the same contactless card, phone wallet, or supported local payment method.
Ticket machines, counters, the HCMC Metro HURC app, QR tickets, and Metro smart cards are also part of the system.
ContactlessQR ticketSmart card
Fare
Single rides are distance-based, roughly 6,000 to 20,000 VND for cashless trips, with one-day and three-day passes available.
If a gate or card type is being fussy, buy a QR ticket or ask at the counter. This is still a young fare system.
Day pass
Airport
No airport rail yet. Tan Son Nhat is still Grab, taxi, or airport bus for most visitors.
Line 1 is useful once you are in the city, especially around Ben Thanh, Opera House, Ba Son, Thao Dien, and Thu Duc.
No airport rail
Network type
Modern metro: three underground central stations, then a long elevated run east toward Thu Duc and Suoi Tien.
That above-ground section is part of why the system feels so visually different from the old construction-zone version of Saigon.
Modern metroElevated metro
Useful line
Line 1 is the whole network for now: Ben Thanh to Opera House, Ba Son, Thao Dien, Thu Duc, National University, and Suoi Tien.
Line 1

Mike’s notes

Ho Chi Minh City finally has a metro, and that sentence matters if you spent any time in Saigon while the city center was carved up by construction sites. For years, Ben Thanh and the Opera House area felt like the promise of a future transit system more than a transit system. Line 1 is the moment where that finally turns into something a visitor can actually use.

It is also convenient. The first line is not a complete city network, but it hits the places that matter for a lot of tourist movement: Ben Thanh, Opera House, Ba Son, Thao Dien, and the east-side run toward Thu Duc and Suoi Tien. If you are staying in District 1, the central underground stations are the obvious starts. If you are eating or staying around Thao Dien, this is suddenly a much cleaner move than sitting in traffic every single time.

How to pay

The visitor version is simple: use one contactless card or one phone wallet, tap in at the gate, ride, and tap out with the same card or device. Do not mix a physical card and the phone-wallet version of that card on the same trip. Fare systems usually read those as different tokens.

If tap-to-ride is not cooperating, buy a single QR ticket from the machine or counter, or use the HCMC Metro HURC app. The system also has Metro smart cards and day-pass products, which can be useful if you are deliberately riding around for the novelty or doing several east-side hops in one day.

Network character

Line 1 is a modern Asian metro, not an old cramped legacy subway. The central piece is underground, then the route climbs onto a long elevated alignment east of the core. That makes it useful and also oddly satisfying: after years of seeing the worksites, you get the reverse view, riding above the streets that used to be blocked by construction.

The practical limitation is that it is still only one line. It does not solve Tan Son Nhat airport, Cholon, the War Remnants Museum, or every District 1 errand. Grab remains the default filler. But for the trips Line 1 actually serves, it is faster, cooler, and calmer than negotiating traffic.

The construction finally paid off

This is the most interesting thing about HCMC right now from a city-building perspective. The first line is brand new, but the construction memory is not. A lot of the city has spent years routing around station boxes and fenced-off streets, and now the payoff is visible: clean stations, air-conditioned trains, and a central rail spine where the map used to be mostly theoretical.

I would treat it as both transportation and a small attraction. Ride it once because it is the beginning of Saigon's rail era. Keep using it when it lines up because the city is hot, traffic is real, and the metro is only going to become more useful as the network expands.

Short history

  1. 2012

    Line 1 construction begins

    Work starts on the Ben Thanh to Suoi Tien line. For years, central Saigon lives with the station boxes, hoardings, and construction sites.

  2. 2024

    The first metro opens

    Line 1 opens on December 22, finally giving Ho Chi Minh City its first urban railway and Vietnam its first underground urban metro line.

  3. 2025-2026

    Payment gets easier

    The fare system moves beyond cash and paper: bank cards, mobile wallets, app QR tickets, local NAPAS cards, and Metro smart cards make occasional visitor trips much less annoying.

  4. Next

    Ben Thanh becomes the hub

    The bigger plan is not a one-line novelty. Line 2 and later routes are meant to turn Ben Thanh into the central transfer point for a much larger HCMC rail network.

Sources and references (4)
  1. MAUR Line 1
  2. HURC app
  3. HCMC guide
  4. Line 2