Lima and Callao Metro Line 1
Villa El Salvador to Bayóvar
Stations
26
End to end
~70 min
Service information checked . Check the operator before travel because schedules can change at short notice.
Line 1 runs from Villa El Salvador in southern Lima to Bayóvar in San Juan de Lurigancho. It crosses Gamarra, the eastern side of central Lima, and the government and museum district around La Cultura. Elevated north-south metro.
Regular service on the rebuilt line began in 2011, and the northern extension to Bayóvar opened in 2014.
Riding the line
Load the dedicated Línea 1 card before joining the gate queue. A bank card cannot be tapped directly at the barrier.
Current vehicles and ride: Line 1 uses six-car electric trains, including the original Italian fleet and later Alstom Metropolis sets. Line 2 uses six-car, fully automated Hitachi Rail trains behind platform screen doors.
Connections: There is no operating rail interchange between Lines 1 and 2 yet. Line 1 connects with buses and the Metropolitano at street level, while the open part of Line 2 remains east of the center. Future transfer stations on published maps do not count as current connections.
Accessibility: Both lines have step-free routes, lifts, tactile paving, and level or near-level boarding. Lift outages matter because many Line 1 platforms are elevated. Check the operator notice when a lift is essential.
Commuter-hour trains and platforms can be severely crowded, especially around Gamarra and Miguel Grau.
Check Lima and Callao Metro for the current timetable and operating notice.
Stations in order
- 1Villa El Salvador
- 2Parque Industrial
- 3Pumacahua
- 4Villa María
- 5María Auxiliadora
- 6San Juan
- 7Atocongo
- 8Jorge Chávez
- 9Ayacucho
- 10Cabitos
- 11Angamos
- 12San Borja Sur
- 13La Cultura
- 14Nicolás Arriola
- 15Gamarra
- 16Miguel Grau
- 17El Ángel
- 18Presbítero Maestro
- 19Caja de Agua
- 20Pirámide del Sol
- 21Los Jardines
- 22Los Postes
- 23San Carlos
- 24San Martín
- 25Santa Rosa
- 26Bayóvar