Line Centro Camaragibe

Recife Metro Line Centro Camaragibe

Recife to Camaragibe

Stations

15

End to end

~34 min

Interchanges

11

Service information checked . Check the operator before travel because schedules can change at short notice.

Line Centro Camaragibe runs from Recife to Camaragibe and has 15 cataloged stops. Recife Centro Camaragibe.

The modern metro began in 1985, absorbing and rebuilding older suburban rail corridors. The South Line followed in stages, while diesel VLTs now work the outer Cabo and Curado branches. The present route opened through those stages.

Riding the line

Use the current CBTU Recife ticket or VEM product accepted for the trip. The electric metro and diesel branches have different hours, so a valid fare does not guarantee a connection.

Current rolling stock and ride conditions: Electric multiple units handle the Center and South lines. Diesel VLT sets run the Cabo and Curado branches over surface railway.

Recife, Joana Bezerra, Afogados, Ipiranga, Mangueira are marked as interchanges in the network data. Recife, Joana Bezerra, Coqueiral, Rodoviária, and Cajueiro Seco are the main transfer points. The Airport station connects with a covered walkway toward the terminal area.

Accessibility: Major electric stations have lifts or ramps, but equipment reliability and the outer VLT platforms vary.

The Curado and Cabo VLT branches finish earlier and run less often than the electric metro.

Check Recife Metro for the current timetable and operating notices.

Stations in order

  1. 1RecifeLine Centro JaboatãoLine Sul
  2. 2Joana BezerraLine Centro JaboatãoLine Sul
  3. 3AfogadosLine Centro Jaboatão
  4. 4IpirangaLine Centro Jaboatão
  5. 5MangueiraLine Centro Jaboatão
  6. 6Santa LuziaLine Centro Jaboatão
  7. 7Edgar WerneckLine Centro Jaboatão
  8. 8BarroLine Centro Jaboatão
  9. 9TejipióLine Centro Jaboatão
  10. 10CoqueiralLine Centro Jaboatão
  11. 11Alto do Céu
  12. 12CuradoVLT Curado branch
  13. 13Rodoviária
  14. 14Cosme e Damião
  15. 15Camaragibe