VLT da Baixada Santista

Light rail · Santos · BR Mobilidade Baixada Santista

3 lines · 28 stations · 15 interchanges

Every line drawn through its stations. Tap a line in the legend to hide or show it.

Lines

Service information checked . Check the operator before travel because schedules can change at short notice.

Quick facts

Operator
BR Mobilidade Baixada Santista
Network
3 operating lines and 28 cataloged stations.
Payment
Use the current BR Mobilidade fare medium. Validate before boarding and keep the card available for inspection.

Mike’s notes

VLT da Baixada Santista serves Santos / São Vicente. The VLT links Barreiros in São Vicente with Porto and Valongo in Santos. The newer central Santos section uses paired one-way streets, so the inbound and outbound stop lists differ.

The first section opened in 2015 on a rebuilt railway corridor. The extension from Conselheiro Nébias to Valongo entered full daily operation in May 2026.

Riding the network

Use the current BR Mobilidade fare medium. Validate before boarding and keep the card available for inspection.

Current rolling stock and ride conditions: Low-floor electric light-rail cars run on reserved railway and street alignments.

Barreiros anchors the São Vicente end. Porto serves the original Santos terminal, while Valongo reaches the historic center and bus connections.

Accessibility: Low-floor cars and raised platforms provide step-free boarding. The street section still requires level crossings and curb access.

Service 953EX1 follows different streets by direction in central Santos. Board at the location listed for the direction being traveled.

Check VLT da Baixada Santista for the dated operating notice before a time-sensitive trip.

Sources and references (1)
  1. Official information