Rio de Janeiro Metro Line 1
Uruguai to General Osório
Stations
20
End to end
~47 min
Interchanges
13
Service information checked . Check the operator before travel because schedules can change at short notice.
Line 1 runs from Uruguai to General Osório and has 20 cataloged stops. Rio 1.
The metro opened in 1979. Lines 1 and 2 expanded through the center and North Zone, while Line 4 reached Barra da Tijuca for the 2016 Olympics. The present route opened through those stages.
Riding the line
Contactless bank cards and accepted local fare products work at the gates. Use the same payment medium for a clean record of the trip.
Current rolling stock and ride conditions: Air-conditioned electric trains run underground except for parts of Line 2. Peak trains are crowded, and cars can fill before they reach the central transfer section.
Estácio, Praça Onze, Central, Presidente Vargas, Uruguaiana are marked as interchanges in the network data. Central connects with TrensRJ and the VLT. Carioca and Cinelândia connect with downtown destinations, while General Osório and Jardim Oceânico anchor the South Zone and Barra ends.
Accessibility: Most stations have lifts, but the route from street to platform is not equally direct everywhere. Check lift status when it matters.
Line 2 may run through to Botafogo or use a different central endpoint depending on the day and operating plan.
Check Rio de Janeiro Metro for the current timetable and operating notices.
Stations in order
- 1Uruguai
- 2Saens Peña
- 3São Francisco Xavier
- 4Afonso Pena
- 5EstácioLine 2
- 6Praça OnzeLine 2
- 7CentralLine 2
- 8Presidente VargasLine 2
- 9UruguaianaLine 2
- 10CariocaLine 2
- 11CinelândiaLine 2
- 12GlóriaLine 2
- 13CateteLine 2
- 14Largo do MachadoLine 2
- 15FlamengoLine 2
- 16BotafogoLine 2
- 17Cardeal Arcoverde
- 18Siqueira Campos
- 19Cantagalo
- 20General OsórioLine 4