VLT Carioca Line 3
Santos Dumont to Central
Stations
10
End to end
~10 min
Interchanges
8
Service information checked . Check the operator before travel because schedules can change at short notice.
Line 3 runs from Santos Dumont to Central and has 10 cataloged stops. VLT Rio 3.
The first line opened in 2016 as part of the port-area street reconstruction. Later routes added the Central, Praça XV, Rodoviária, and Terminal Gentileza links. The present route opened through those stages.
Riding the line
Validate with the current Jaé fare system before or immediately after boarding as directed. The VLT uses proof-of-payment checks rather than metro-style gates at every stop.
Current rolling stock and ride conditions: Low-floor electric trams run in streets and reserved lanes without overhead wires across much of the center.
Santos Dumont, Antônio Carlos - MAM, Cinelândia, Carioca, Sete de Setembro are marked as interchanges in the network data. Santos Dumont, Cinelândia, Carioca, Central, Praça XV, Rodoviária, and Terminal Gentileza are the main anchors.
Accessibility: Stops have low platforms and level boarding. Street crossings and broken lifts at connecting systems can still affect the full trip.
Downtown events and street works can alter routes. Read the line number and destination because several services share central track.
Check VLT Carioca for the current timetable and operating notices.